Misisi Gold Project

Anchored by the 3.11 Moz Akyanga Inferred Mineral Resource within a 55 km mineralised corridor.

The Misisi Project covers approximately 133 km² in South Kivu Province, Democratic Republic of the Congo. At its core, the Akyanga Deposit hosts an NI 43-101 compliant Inferred Mineral Resource of 40.8 Mt grading 2.37 g/t Au for 3.11 Moz of contained gold. Beyond Akyanga, multiple priority targets provide opportunities for further exploration across the broader Project.

High-grade Akyanga deposit

3.1 Moz @ 2.37 g/t Au

(40.8 Mt Inferred, NI 43-101)

Valid mining exploitation permits valid until 2045

5

Mineralised corridor

55km

High-priority satellite atilite targets within 25 km of Akyanga

72% Avanti

Controlled ownership
MMG 2025 Dillution
72% AGC | 18% MMG | 10% DRC
Ratified under 2018 Mining code

Key Sites
See Image above
Key Facts
Akyanga is currently the only deposit within Misisi with a defined Mineral Resource. Five priority regional targets — Akyanga East, Ngalula, Tulonge, Lubitchako and Kilombwe — have been identified for follow-up exploration across the broader Project. Avanti’s 42,000-metre 2026 program is designed to test both resource expansion at Akyanga and regional discovery opportunities.

Project Overview & Ownership Structure

01

Avanti holds a majority controlling interest in the Misisi Project, subject to the Company’s applicable joint-venture and mining-title arrangements.

02

Three contiguous mining exploitation permits cover approximately 133 km² along a 55 km mineralised corridor on the Kibara Gold Belt and are valid to 2045.

03

The Akyanga Deposit hosts an NI 43-101 compliant Inferred Mineral Resource of 40.8 Mt grading 2.37 g/t Au for 3.11 Moz of contained gold.

04

The current Akyanga Mineral Resource extends for approximately 2.1 km of strike and remains open along strike and at depth.

05

The current Akyanga Mineral Resource extends for approximately 2.1 km of strike and remains open along strike and at depth.

Project Timeline

2004 – 2014
Early Exploration
Discovery, drilling and initial resource definition at Akyanga.
2015
Mining Licences Granted
Three contiguous mining licences issued across the 55 km project corridor.
2018
3.1 Moz Resource Established
A 3.1 Moz JORC resource was reported at Akyanga by the previous operator.
2022-2023
Avanti Takes Control
Regency acquires Casa Mining, followed by Avanti’s acquisition and NI 43-101 resource work.
2024 – 2025
Project Re-Activated
Historical core work, project planning, operating team build-out and financing position Misisi for renewed large-scale exploration.
2026
Largest Exploration Program to Date
42,000 m exploration program underway, supported by six rigs; significant Akyanga drill results reported and C$51.75M financing completed.
2027-Planned
Next Technical Milestone
Updated resource work and Preliminary Economic Assessment, subject to exploration results and technical studies.

Location & Infrastructure

Strategically Located with Established Regional Access

The Misisi Gold Project is located in the Fizi Territory of South Kivu Province in eastern Democratic Republic of the Congo, along the prospective Kibara Gold Belt. The Project comprises three contiguous mining licences covering approximately 133 km² across a 55 km mineralised corridor.
‍
Avanti uses Kalemie, in neighbouring Tanganyika Province, as a principal logistics and operational support base for exploration activities at Misisi. Kalemie provides access to established airport, port, power and road infrastructure that supports equipment mobilisation, personnel movement and regional supply.

Infrastructure

Road Access
The Project can be accessed from Kalemie via approximately 180 km of the N5 corridor. Road access is also available toward Baraka on Lake Tanganyika, approximately 110 km from the Project area.
Air Access
Lulimba Airstrip is located approximately 12 km north of the Misisi Project, providing local air access to the Project area. Kalemie Airport has an approximately 2.5 km paved runway supporting passenger, freight and charter operations.
Port & Regional Supply Chain
The Port of Kalemie provides access to Lake Tanganyika and established regional supply routes connecting the DRC with neighbouring countries, supporting the movement of equipment and materials into the region.
Power Infrastructure
Regional infrastructure includes the Bendera hydropower facility near Kalemie, with approximately 24 MW of installed capacity. Avanti will assess the Project’s future power requirements as technical studies advance.

Location

12 km

to Lulimba Airstrip

~110 km

to Baraka / Lake Tanganyika access

~180 km

to Kalemie operational base

133 km

three contiguous mining licences
55 km mineralised corridor | Mining licences valid to 2045

Mineralized Endowment

The DRC hosts major gold, copper and cobalt systems across multiple mineral belts.

Established Mining Industry

Large-scale operations including Kibali and Kamoa-Kakula demonstrate established mining and project-development activity in the DRC.

Misisi's Advantage

Akyanga hosts a 3.11 Moz Inferred Mineral Resource within the prospective Kibara Gold Belt.

World-Class Endowment

Major gold, copper and cobalt systems across multiple mineral belts.

Proven at Scale

Kibali, Kamoa-Kakula, KCC and Mutanda show established large-scale operating precedent.

Misisi's Advantage

3.1 Moz resource on eastern DRC's prospective Kibara Gold Belt.

Resource Estimate

Akyanga Mineral Resource

40.8 Mt

Inferred Mineral Resource

2.37 g/t Au

Average Grade

3.11 Moz Au

Contained Gold

The current NI 43-101 compliant Akyanga Inferred Mineral Resource is based on 19,956 metres of historical drilling, including 105 diamond drill holes and six reverse circulation holes. The Mineral Resource extends over approximately 2.1 km of strike from surface to approximately 350 m vertical depth and remains open along strike and at depth.
‍
‍
Technical Note: The Akyanga Deposit hosts an NI 43-101 compliant Inferred Mineral Resource of 40.8 million tonnes grading 2.37 g/t Au for 3.11 million ounces of contained gold. The Mineral Resource Estimate has an effective date of June 30, 2023 and was constrained using a US$1,500/oz gold price and a 0.50 g/t Au cut-off grade. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.

‍NI 43-101 Technical Report: Independent Technical Report, Misisi Gold Project and Akyanga Mineral Resource Estimate — August 1, 2023.

View Technical Report

Geology & Mineralization

Akyanga hosts a laterally and vertically extensive gold mineralised system that remains open along strike and at depth. Ongoing 2026 drilling is providing additional information on the geometry, continuity and grade distribution of mineralisation within and below the current pit-constrained Mineral Resource and is being incorporated into Avanti’s evolving geological model to refine follow-up drilling.

17.25 m @ 2.44 g/t Au

MSDD0154
including 5.75 m @ 4.39 g/t Au

22.00 m @ 1.57 g/t Au

MSDD0155
including 3.40 m @ 5.63 g/t Au

12.27 m @ 5.39 g/t Au

MSDD0156
including 3.78 m @ 12.88 g/t Au
View Full News Release

Technical Note: Reported drill intercepts are downhole lengths. Based on the current geological interpretation, true widths are estimated to be approximately 85% of the reported downhole lengths. Reported grades are calculated as length-weighted averages of uncut assay results.

Near-Term Growth Targets

Increase Reseource Confidence
Infill drilling and geological work designed to improve geological confidence and support future resource updates and technical studies.
Discover New Deposits
Systematically test priority regional targets across the broader 55 km mineralised corridor.
Expand
Akyanga
Step-out and follow-up drilling along strike, down dip and at depth to test extensions of the current 3.11 Moz Inferred Mineral Resource.

Current Targets

Akyanga East

Ngalula

  • Parallel structure approximately 500 m east of Akyanga
  • Approximately 2.5 km mineralised quartz-vein system
  • A defined high-grade resource with multiple pathways to district-scale growth.
  • 2,500 m Phase I follow-up drill program planned/refined
  • Parallel gold-in-soil zones extending over approximately 8 km of strike
  • Two mineralised zones defined through geochemistry, artisanal workings and geological mapping
  • Rock-chip samples grading up to 19.98 g/t Au and 12.50 g/t Au
  • Channel results include 3.0 m @ 1.88 g/t Au and 3.3 m @ 1.75 g

Current Targets

Akyanga East

  • Parallel structure approximately 500 m east of Akyanga
  • Approximately 2.5 km mineralised quartz-vein system
  • A defined high-grade resource with multiple pathways to district-scale growth.
  • 2,500 m Phase I follow-up drill program planned/refined

Ngalula

  • Parallel gold-in-soil zones extending over approximately 8 km of strike
  • Two mineralised zones defined through geochemistry, artisanal workings and geological mapping
  • Rock-chip samples grading up to 19.98 g/t Au and 12.50 g/t Au
  • Channel results include 3.0 m @ 1.88 g/t Au and 3.3 m @ 1.75 g

Community & Local Partnerships

Building Long-Term Relationships Around Misisi

The Misisi Project has a long history of engagement with local communities, traditional stakeholders, government authorities and artisanal mining cooperatives. Avanti is building on these established relationships as exploration activities expand across the Project.

Since 2010, the Misisi Project and its previous operators have worked with the Misisi community and local artisanal mining cooperatives through successive exploration programs, local agreements and community initiatives. Avanti’s approach is focused on maintaining constructive dialogue, supporting local participation and developing relationships that can grow alongside the Project.

A History of Local Investment

Community initiatives undertaken in connection with the Misisi Project have included:
01
02

Construction of the Etuhu River bridge

03

Rehabilitation of six local schools and construction of one new school

Local employment and participation associated with exploration activities

Ongoing engagement with local artisanal mining cooperatives

Support for an adult literacy program

Construction of a community meeting hall

04
05
06
01

Rehabilitation of six local schools and construction of one new school

02

Construction of a community meeting hall

03

Construction of the Etuhu River bridge

04

Support for an adult literacy program

05

Local employment and participation associated with exploration activities

06

Ongoing engagement with local artisanal mining cooperatives

Looking Ahead

As exploration advances, Avanti intends to continue working with local communities, government authorities and other stakeholders to identify opportunities for local employment, procurement, skills development and community investment.
The Company’s objective is to advance Misisi responsibly while building long-term relationships and creating opportunities for the communities surrounding the Project.

Working Alongside Local Artisanal Miners

Avanti has entered into a formal profit-sharing and cooperation agreement with Sycomines, the licensed and permitted artisanal gold mining association operating within areas of the Misisi Project. The agreement provides a framework for cooperation between Company exploration activities and established local artisanal mining activities while supporting ongoing stakeholder engagement.

7 Schools

6 rehabilitated + 1 constructed

Local Partnerships

Ongoing stakeholder and artisanal mining engagement

Community Hall

Supporting local engagement

Etuhu River Bridge

Local infrastructure investment

Press Release Subscriptions

Please fill out the form below to receive company press releases via email when they occur.

Stay Connected

Subscribe for the Latest Avanti News

Join our distribution list to receive news releases, exploration updates, corporate announcements and investor materials from Avanti Gold Corp.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.

We respect your privacy. We do not sell, rent, or loan any information to any third party. Any information you give us is held with the utmost care and security, and will be used only in ways to which you have consented.

Stay Connected

Subscribe for the Latest Avanti News

Join our distribution list to receive news releases, exploration updates, corporate announcements and investor materials from Avanti Gold Corp.

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.